Comprehensive DevOps Audit and Strategy Services

DevOps consulting: DORA metrics, DevOps Maturity Assessment, transformation roadmap, delivery process optimization, and engineering team culture.
Showing 30 of 37All 1054 services

Our competencies:

Frequently Asked Questions

Latest works

  • Development of a web application for FEEDME
    Development of a web application for FEEDME
    1359
  • Development of an online store for the company FURNORO
    Development of an online store for the company FURNORO
    1330
  • B2B Advance company logo design
    B2B Advance company logo design
    776
  • Development of a web application for Enviok
    Development of a web application for Enviok
    1077
  • AIDER company logo development
    AIDER company logo development
    1022
  • CRM development for Chasseurs
    CRM development for Chasseurs
    1113

DevOps Consulting: Infrastructure Audit and Maturity Strategy

An engineer comes with a request: "we want to implement DevOps." We start digging and discover that the team already has CI/CD, Kubernetes, and monitoring. But deployments still take three hours, after each release an on-call engineer sits for half an hour watching logs, and half of the alerts in Alertmanager are silenced because "they always fire and mean nothing." In over 5 years of working with infrastructure, we have seen such situations in every second company—from startups to enterprises with hundreds of microservices.

This is not a problem of lacking tools. It is a problem that tools are not aligned with outcomes, and processes are not measured. Without objective metrics, any improvement is guesswork. We guarantee audit transparency: you will see not just a report but a prioritized roadmap with measurable goals.

What are DORA metrics and how are they measured?

DORA metrics are four indicators that statistically correlate with an organization's business outcomes. Their value lies in being objective and measurable, unlike "our CI/CD works fine." Here are the key metrics according to the DevOps Research and Assessment report:

Deployment Frequency — how often the team deploys to production. Elite performers deploy on demand (multiple times a day). Low performers deploy once every few months. According to the report, elite teams deploy 200 times more often than low performers. Low deployment frequency almost always means large batches of changes → high risk → fear of deploying → even lower frequency.

Lead Time for Changes — time from commit to production. Includes queue time, pipeline time, review time, time after merge to deployment. For strong teams, it is less than an hour. If Lead Time is more than a week, there is likely a manual gate or a pipeline that no one has optimized.

Change Failure Rate — percentage of deployments that caused an incident or rollback. The norm for elite performers is less than 5%. If CFR is above 20%, deployments become scarier each time, the team starts postponing them—and you end up with a Deployment Frequency problem.

MTTR (Mean Time to Restore) — average time to recover from an incident. The DORA report states that elite teams recover in less than an hour. It's important not only to have a runbook but also to quickly understand what exactly broke. Without proper observability (Prometheus, Loki, Tempo, OpenTelemetry), MTTR increases not because people work slowly but because it's unclear where to look.

We measure these metrics at the start of engagement—where data exists in git, CI systems, and incident trackers. This provides an objective picture and later allows evaluating the result of changes with precision.

How does the audit process work?

Day 1 — Gather data without judgment

We review .gitlab-ci.yml or .github/workflows/, Dockerfiles, Terraform configurations, Helm charts, Grafana dashboards, Alertmanager rules. We talk to the team—not "what's wrong with you" but "show us a typical deployment" and "what was the last major incident and how did you detect it." On average, in one day of audit we identify 10–15 specific problems, half of which affect DORA metrics.

Day 2 — Analyze bottlenecks

Often the biggest gain is not where expected. The team wants to "configure Kubernetes properly," but the real issue is that Lead Time for Changes is 4 days because merge requests sit for 3 days in review because MRs are too large because the pipeline is unstable and developers accumulate changes. This chain is only revealed through a systemic view.

Result — Prioritized roadmap

Not a PDF with estimates, but a concrete plan: what to do in the first month, in a quarter, and on a half-year horizon. Priorities justified through impact/effort. Each roadmap item is tied to target DORA metrics—for example, "reduce Lead Time from 4 days to 2 hours by the end of the month" or "decrease CFR from 15% to 5% in a quarter."

DevOps Maturity Matrix: What and How We Assess

An audit is a structured assessment across seven domains. Each domain has a level from Initial to Optimizing and directly impacts the final metrics.

Domain What We Check
Source Control Branching strategy, merge policies, PR size, time-in-review
CI/CD Automation coverage, pipeline time, reliability, caching
Testing Test pyramid, coverage, execution time, flaky tests
Configuration IaC coverage, drift between code and reality, secrets management
Monitoring RED metrics, alerting noise, SLO/SLA, incident detection time
Security SBOM, pipeline scanning, access management, secret rotation
Culture Blameless postmortems, retrospectives frequency, knowledge sharing

If monitoring is at the Initial level, there is no point wasting time on pipeline optimization—incidents in production will negate any gains. The domain order in the roadmap is determined by their impact on DORA metrics based on our experience.

What typical problems do we find during audits?

On most projects, we find one of the following:

  • Terraform state in git repository with committed .tfstate files. Sometimes with secrets in plaintext—because aws_db_instance writes password into state, and state is in git. This is fixed by migrating to a remote backend, but first, check git history for sensitive data.
  • Alertmanager with hundreds of rules, of which 80% never fire as intended. KubeCPUOvercommit fires constantly because requests/limits are not set. PodCrashLooping alerts on batch jobs that should exit with code 0 but sometimes fail. The on-call engineer stops reacting to everything—and misses a real incident. After alert cleanup, noise level drops by 70%, and MTTR by 35%.
  • Jenkins without shared libraries. Each repository has its own Jenkinsfile with 200+ lines of duplicate deployment logic. Changing the deployment process requires updates in 15 repositories. No one is sure that all repositories are updated synchronously. Migration to a single library cuts Lead Time for Changes in half.

What is included in the audit results?

You will receive a document that includes:

  • Current DORA metrics values with explanation of each deviation from target levels.
  • Maturity matrix across seven domains with color coding (Red/Yellow/Green).
  • Prioritized backlog of tasks for 1, 3, and 6 months tied to expected metric improvements.
  • Set of technical recommendations: specific changes to configs, pipelines, policies.
  • Video recording of the review (on request) so the team can revisit explanations.
  • Access to our chat during the engagement period (if you choose the "audit + implementation" format).
Preparation checklist before the audit
  • Provide access to source code and infrastructure repositories.
  • List of CI/CD systems (GitLab CI, GitHub Actions, Jenkins) and URLs.
  • Current accounts for monitoring (Grafana, Prometheus, New Relic).
  • Description of the typical deployment process (in free form).
  • List of recent incidents (last 3 months) with their recovery times.

Estimated timelines and cost

Phase Duration
Small team audit (up to 10 engineers, 1–2 products) 3–5 business days
Medium-scale audit (10–50 engineers, multiple products) 1–2 weeks
Strategic engagement for a quarter (audit + implementation) Calculated individually

Cost is determined after an initial conversation—we assess the infrastructure volume, number of microservices, CI/CD complexity. Typical time savings after the audit is up to 40% per deployment, and ROI is achieved within the first 2–3 months due to reduced incidents.

Why trust our team with your audit

We have been providing comprehensive DevOps audit and strategy services since 2018—over 5 years of experience. During this time, we have conducted over 50 successful audits for companies of various sizes, from fintech to edtech. Certified engineers (CKA, AWS SA, Terraform Associate) work with clouds (AWS, GCP, Yandex Cloud, Selectel) and on-premise.

Our approach is not template questionnaires but deep diagnostics tied to DORA metrics. We don't just say "you're bad"—we show how each change will impact deployment frequency, recovery time, and production stability.

Contact us for a preliminary assessment of your project—we will analyze typical metrics from public data (e.g., CI/CD configuration) and tell you whether a full audit is worth it. Book a consultation, and together we will identify which problems to tackle first.